Candidatii eJobs pot alege daca CVul lor este: CONFIDENTIAL, PUBLIC sau daca este disponibil doar clientilor eJobs. CVul de pe acesta pagina este public (fara date de contact insa). CVul Public ii ofera candidatului mai multe oportunitati de a fi gasit si contactat de potentiali angajatori. CVurile disponibile doar clientilor eJobs au un format mai complex, contin mai multe informatii si sunt mult mai detaliate.
Candidatii eJobs isi pot schimba in orice moment disponibilitatea CVului.

Daca sunteti firma si doriti sa contactati candidatul de mai jos, trimiteti-ne aceasta cerere la Contact@ejobsgroup.ro, alaturi de linkul catre aceasta pagina.

Unul din Relationship Managerii eJobs o sa va contacteze in maxim 24 de ore si o sa va ofere datele de contact DOAR dupa ce candidatul isi exprima acordul in acest sens.




Curriculum Vitae

informatii personale

 

M 30.10.1975

Permis conducere:  Cat.B, Data obtinerii:17.12.2010

Stagiu militar: nu

obiectiv

 

Secure a challenging engineering position where in my team player attributes, experience, and communication skills can be utilized in obtaining personal career goals and those of the employer.

Salariu: nespecificat

Tip job: Part time, Full time, Proiect / Sezonier

Departament: Inginerie, Petrol / Gaze, Service / Reparatii

Oras de lucru: Bucuresti, STRAINATATE

Nivel Cariera: Mid-Level (2-5 ani)

Disponibil: oricand

experienta profesionala

 

20.02.2012 - 30.04.2013

Departament: inginerie

Titlu Job: electrical commissioning engineer

Responsabilitati:

Commissioning work
• Commissioning tests for MV SWGRs (10 kV – SIVACON Siemens): System Check, internal wiring checks , local operations & functional tests for the MV breakers (NXAIR-P), Insulation Resistance test, tests for CTs & VTs, secondary injection for checking the metering (ammeters & voltmeters), current and voltage transducers (Siemens), undervoltage relays (Siemens), time relays (Siemens), Mechanical & Electrical interlocks for SWGRs, signals testing with I&C cabinets (TXP,TXS,PACS,SICS etc), verification of Wiring & Logic Diagrams and Operation Scenarios with I&C Engineers.
• Commissioning tests for LV Transformers (10kV/425V & 10kV/725V – Siemens GEAFOL) : System Check, Insulation Resistance test, verification of PTC temperature sensors, CT testing, transformer ratio, alarms & trips testing with PTC resistor relay MSF 220K (Ziehl), verification of Wiring & Logic Diagrams and Operation Scenarios with I&C Engineers.
• Commissioning tests for Regulating Transformers (400/415 Vac – Ruhstrat NRD): System Check, verification of PTC temperature sensors with relays MSF 220K (Ziehl), insulation resistance test , alarms testing, transformer ratio and verification of operational function (voltage regulating), verification of servo-motor and verification of Wiring & Logic Diagrams and Operation Scenarios with I&C Engineers.
• Commissioning tests for LV SWGRs (400 & 690V – SIVACON Siemens): System Check, internal wiring checks, Insulation Resistance test, local operations & functional tests for the LV breakers (Siemens SENTRON 3WL), verification of : protection settings for LV breakers (L-S-I-N) and the protection units ETU76B, time relays (Siemens Sirius) ,Undervoltage relays (DOLD), Arc Protection Relay VAMP221 with I/O units (VAM10L/VAM3L/VAM4C), transducers (Siemens) ,verification of Wiring & Logic Diagrams and Operation Scenarios with I&C Engineers acording to I&C Allocation Report.
• Commissioning tests for Convertors 220/24 Vdc (AEG): System Check, internal wiring checks, Insulation Resistance test, Electrical function test (test of metering, alarms and mechanical operation of breakers & fuse switches).
• Preparing systems up to TOTO (Take Over to Temporary Operation) and hand over to TCOM (Transverse Commissioning) and OIO (Operation Integrated Organization).

Documentation work
• Creation of CRs (Clarification Request) or OP (Open Points) in case of inconsistency between design drawings and site equipment installation or NCRs (Non-Conformity Report) for installed equipments which does not match the specifications described in the System Description.
• Update of documentation for SCPs (System Commissioning Program) , SCIs (System Commissioning Instructions) and RRS (Result Record Sheet).
• Implementation and follow up of FCRs (Field Change Request) from Design Department.
• Creation of CDS (Commissioning Documentation Sheet) after performing each step described in SCPs.
• Verifications of NTM (Nuclear Testing Manual) & EOMM (Equipment Operating and Maintenance Manual).
• Documentation for SCP RFA (Release for Application) and KOT-RFCC (Commissioning Inspection before “Ready for Commissioning Certificate”)

Trainings
Occupational Safety Green Card
Winnova SFS 6002 – Safety at Electrical Work
Quality Assurance & Nuclear Safety Culture
TVO Area Induction Training
TXP Functional Diagrams (TELEPERM XP)
IT Security Training & IT Security Awarness for Nuclear Power Plants
Power Switching Authority (PSA) Training
First Aid Training
QP Database Training (Quality Products)
General Commissioning Training OIO processes: PTW, PTT & Key Management
Training for Installation instruction for termination of low voltage & I&C cables in NPP
CMS Training (Blocking/Test Permit/Work Order/Temporary Modifications)
Mechanical & Chemical Risk
BBX Training from IT Security (Black Boxes)

01.04.2011 - 17.09.2011

Departament: inginerie

Titlu Job: electrical commissioning engineer

Responsabilitati:

Responsabilities:
• Commissioning tests for MV SWGRs (6.6kV – Schneider Electric MC Set) : internal wiring checks , check of contact
resistance for the bus-bars , tests for CT’s & VT’s , local operations & functional tests for the MV breakers , secondary injection for checking the metering (ammeters , voltmeters , current and voltage transducers) , interlocking tests for MV / LV / EDG switchgears , signals testing with DCS .
• Commissioning tests for LV SWGRs (400V - Schneider Electric) : insulation resistance , tests for CT’s , local operations & functional tests for the LV breakers , secondary injection for checking the metering , automatic changeover tests for LV SWGRs , signals testing with DCS ;
• Commissioning tests for protections of MV/LV SWGRs : Sepam Relay Protection Unit (MV) , IME Syncro 96C (synchro relay) , Arc Protection Unit (VAMP120) , Thytronic Protection Relay (LV) , under voltage relays , earthfault relays etc .
• Commissioning (with Vendor) for Fire Detection System : testing conventional smoke & heat detectors with Local Fire Detection Panels (Kentec Sigma XT), testing addressable smoke & heat detectors with Central Fire Detection Panels (Schrack BMZ Integral) , tests of solenoid valves for extinguishant systems (INERGEN TYCO for electrical rooms and fire fighting & diesel pumps for transformers areas) , extinguishant manual stop/release buttons , conventional combined sounders and strobe.
• Commissioning (with Vendor) for BMS System : signals checks for Analog Inputs (sensors) , Analog Outputs (3-way-valves actuators) , Digital Inputs (Differential Air Pressure Switches) and Digital Outputs (relays); testing Air Handling Units , chillers , smoke exhaust panels , smoke hatches , fire dampers etc.
• Inter-connection of systems and signals testing between BMS , Fire Detection , Gas Detection and DCS

07.09.2009 - 07.09.2010

Departament: inginerie

Titlu Job: electrical engineer

Responsabilitati:

Responsabilities:
• Part of the engineering team in charge with the design of secondary cable tray axis and size , in order to harmonize the cable flows installed by different subcontractors;
• The job involve a combination of problem solving and coordinating with all disciplines engineers to provide the best possible solution and obtainining the client’s approval;
• Interfacing with other different discipline engineers (civil,mechanical,instrumentation,piping etc) and liaising with sub-contractors and other divisions within the company ;
• Collecting information from different sub-contractors and various databases (VPE , KADIS and DESY) in order to determine the quantity of cables required for each area of Nuclear Island;
• Design of the secondary cable trays routes based on the separation principle , using the criterias of Division , Voltage Level and Safety/Non-Safety relevant cables and determining the best solution for the wall penetrations for cable routing;
• The design is taking into account the informations of missing cables in the cable databases, gathered from Black Box (interface area between various sub-systems), I&C and Building Technology documentation (public address system , normal,emergency & essential lighting, fire & alarm system,CCTV,inter-comm system ,announciation system etc);
• Handling all kind of Field Change Requests (FCRs) related to electrical engineering.
• Adaptation and change of design drawings according to site request, by modifing AutoCAD drawings, by creating Viewpoints in 3D Model with NavisWorks or simply by modifing the hardcopies and processing the changes within the FCR process (handling, documentation, approval, follow up).
• Input for implementation of FCRs in 3D PDMS for preparing of drawings for the execution team;

07.08.2007 - 14.12.2008

Departament: inginerie

Titlu Job: electrical supervisor & commissioning engineer

Responsabilitati:

My responsabilities in this project :
• Supervision of construction activities : installation of MV , LV and MCCs switchgears , auxiliary transformers , motors & pumps , GT’s skids , UPS , chargers & batteries , fin-fan coolers , chillers , CCW pumps, Gas Compressors , Is-Limiters etc.
• Commissioning tests for LV Switchgears, functional tests , including the protections;
• Commissioning tests for batteries,chargers & UPS system ;
Commissioning tests for for auxiliary transformers (11/0/4 kV ) including the protections ;
• Commissioning tests for GT’s MCC’s , including the motors & pumps checks – cable megger , rotation check & running test ;
• Testing with DCS of various equipments from the power plant;
• Interlock tests between MV SWGR , LV SWGR and MCC’s ; interlock tests between MV SWGR, LV SWGR and Emergency Diesel Generator ; interlock tests Is-Limiter with MV SWGR and Generator Excitation ; interlock tests CCW pumps with Chillers;
• Submission of testing procedures & test reports to the client for aproval ;
• Apply of TAG-OUT/LOCK-OUT procedure and running commissioning tests under the Work Permit System aproved by the client.

Used software , tools & technologies :
Software : Microsoft Office , AutoCAD , Microsoft Visio;
Tools & Technologies : Primary & secondary injection kits, 3 phase relay tester , Megger 5000V,
phase rotation meter , clamp meter (0-2000 A), ABB SACE Pro010T Comunicator.

11.12.2004 - 10.02.2007

Departament: inginerie

Titlu Job: electrical commissioning engineer / permit to work coordinator

Responsabilitati:

My responsabilities in this company were :
• Commissioning tests for MV Panels & Switchgear (ABB Unigear - 11 kV) :
o tests for CT’s & VT’s : insulation resistance, winding resistance , magnetization curve ratio , polarity , secondary load (burden) ;
o internal wiring checks for MV panels ;
o insulation resistance , local operations & functional tests for the MV breakers
o interlocking tests between MV switchgears , MV – LV , MV – Emergency Diesel Generators switchgear , HSBT test (High Speed Bus Transfer) .
o To check the contact resistance for the bus-bars and for the bus-ducts ( ductor test ) ; Hi-pot test for the switchgear;
o Secondary injection for checking the metering (ammeters , voltmeters , energy meters current and voltage transducers);
o Primary injection for checking CT&VT ratio & polarity , differential protection for the bus-bars (Alstom High Impedance Relay) and for the cables (Solkor relay) ;
• Commissioning tests for LV Panels & Switchgear (ABB - 400 V) :
o Secondary injection for checking the metering (ammeters , voltmeters , energy meters current and voltage transducers);
o Insulation resistance tests, overload breaker test , earth fault test, contact resistance, transducers metering, functional test, relays testing, protections settings for breakers (L,S,I,G) , etc
o functional tests & automatic changeover tests for switchgear including interlock test with Emergency Diesel generators switchgear.
• Commissioning tests for Step-Up Transformers (15.75 / 400 kV) and Auxiliary Transformers
(15.75 / 11 kV and 11 / 0.4 kV) : tests for the CT’s , measurement of impedance , excitation
current , phase displacement (vector group) , protection devices tests (sudden pressure
release device , winding temperature indicator , Buchholtz relay etc.) , alarms & trips testing ,
tests of cooling fans , operations with the tap changer , Tan-Delta measurement ;
• Commissioning tests for Generator Circuit Breaker (ALSTOM) : tests for CT’s & VT’s (insulation resistance , winding resistance , ratio ,polarity ,magnetization curve etc) , ductor test for the breaker contacts , functional tests with generator & transformer protection panels and DCS ;
• Commissioning tests for DC Distribution panels : insulation resistance,metering ,alarms , primary injection for the incoming and outgoing breakers , also protection settings for breakers, earthfault and undervolatge relay testing ,transducers tests, functional tests (with / without load).
• Commissioning tests for Batteries , Inverters & Chargers(rated voltages : 220, 110, 24 V produced by CEG Italy): insulation resistance test; charge, discharge and recharge of the batteries; for the rectifier checking the input voltage and output dc voltage, static stability for different load conditions, measuring the output ripple voltage and the earthfault sensitivity.
• I was involved in the commissioning of Gas Turbines Units # 1,2,3 (General Electric - USA) and Steam Turbines Units 1&2 (Toshiba – Japan) , testing signals and commands from MARK VI (loop checks) and functional tests from DCS to electrical equipments , including the Generator & Transformer Protection Panel , commissioning tests for Gas & Air Compressors , Gas Injection Fans ,Forced Draft Fans , Feedwater Pumps , motors (from 400 V up to 11kV) , motor operated valves (AUMA) etc.
• Commissioning tests for protections for 11 kV substations and main transformers : REF 542plus relay (MV) Spau 140 (synchro relay) , Solkor (differential prot. relays), Bucholtz relay,Microelecttrica Scientifica relays for motors , over and under voltage relays,synchronizing relays etc .
• After the energization of the Gas Turbine Unit #1 I was in charge as Permit To Work Coordinator with the following responsabilities :
o issue of the work permits and ensuring safe conditions for work in energized areas ;
o ensuring the complete compliance of the activities with the safety procedures and practices ;
o maintaining a safe working environment for all personnel working on the job site.

Used software , tools & technologies :
Software : Microsoft Office , AutoCAD , Microsoft Visio , Smart Draw 7 , Solkor Reydisp
Evolution , Omicron , MS Com (Pro & N-DIM-N) ,Alpha Plus (for energy meters)
Tools & Technologies : Primary injection kit (ODEN AT) Secondary injection kit (Omicron ,
3 phase relay tester, CTER-91 ) , Megger 5000V , miliohm meter , phase rotation meter ,
step- up transformer (5000 Vac) , Hioki Memory Hicorder,clamp meter (0-2000 A),current probe
(1mA/1mV), Digital Thermometer , ABB SACE Pro010T Comunicator , load banks for
battery chargers , Digital Ohmeter (Megger DLRO600) , Programma Sverker ,TOSMAP DCS.

27.02.2002 - 27.04.2004

Departament: inginerie

Titlu Job: electrical design engineer

Responsabilitati:

My responsibilities to this company were :
• To make the selection of LV electrical equipments: circuit breakers, contactors, panels, switchboards, lighting fixtures. Protection , control and alarm relays for motors and pumps
( automatization) ;
• Dimensioning the electrical circuits for : light and power systems, fire fighting systems , protection against lighting, additional supply in case of failure of the main supply (UPS) , using the specific software (Ecodial 3 , DiaLux 2.6 , Disano DLux) .
• To make the selection of the systems for distribution of electrical energy and protection of users , equipments and installations : lighting protection systems , earthing installations , low current installations (burglar / fire detection systems , smoke ventilation system , communications systems , CCTV systems , Data/Voice systems.

Major Projects :
• “Carrefour Orhidea” Commercial Center ;
• “Mamaia Nord-Navodari” Hotel ;
• “Washington” Hospital;
• Several “RADET” District Heating Distribution Centers;
• “Romstal Group” Residential Buildings;
• “Philosophy College” Library;
• “Romexpo” Commercial Center;
• “Lackner & Schwarz “Custom Offices and Warehouses.
• “Moxa” Office Building.
• “Dietrich” Warehouse.
• “Biotehnos” Medical Research and Development Facility.

Used software , tools & technologies : AutoCAD 2000 , DiaLUX 2.6 , Disano Dlux , Ecodial 3

11.11.2001 - 15.02.2002

Departament: inginerie

Titlu Job: electrical construction engineer

Responsabilitati:

My responsibilities to this company were :
• To ensure the complete compliance of the activities with the safety procedures
• Supervision of personnel in charge with the installation of electrical equipments (fans , motors
pumps , lighting system , earthing system, MV\LV cables etc);
• Assistance for Commissioning Departament for testing of electrical equipments & completion
of punch lists .

27.07.1999 - 27.11.2001

Departament: inginerie

Titlu Job: electrical engineer

Responsabilitati:

My responsibilities to this company were :
• To ensure the complete compliance of the activities with the safety procedures and practices ;
• Supervision of personnel in charge with the installation of LV/MV panels and testing of power & control cables ;
• Pre-Commissioning & Commissioning for MV / LV switchgears : tests for CT’s & VT’s , internal wiring checks for panels , local operations & functional tests for the LV / MV breakers (local & remote) ; secondary injection for checking the metering (ammeters , voltmeters , energy meters , current and voltage transducers); primary injection for testing protections for switchgear ; functional tests & automatic changeover tests for switchgears including interlock tests .
• Coordination of commissioning team for tests of the primary / secondary circuits for LV/MV panels and for DCS system : transformer protections, generator protections (over temperature relays, Bucholtz relay, over and under voltage relays, auxiliary relays, over current relays, time relays, signaling relays etc…);
• Commissioning tests for motors (from 400V up to 6 kV) : feedwater pumps , air & gas fans , lube oil pumps for turbine , etc.
• Supervising all checking and testing necessary to complete the works, final loop checking and handover, including all necessary documentation;
• Pre-Commissioning & Commissioning for instrumentation & control equipment : testing , calibrating and put in operation for different types of pressure transmitters, pressure switches, level transmitters, flow measurements, thermocouples NiCrNi, thermo resistance Pt100, axial displacement transmitters ;
• Testing of electrical circuits for boiler protection panel (TRICONEX ) & turbine protection panel
(BENTLEY) , checking of limit values (alarms & trips) for electrical & instrument equipments ,
loops check to DCS .

Used software , tools & technologies :
Software : Microsoft Windows , Microsoft Office , DCS (DAMATIC XD)
Tools & Technologies : Primary & Secondary Injection Kits , Hand Held Communicator ; air,vacuum and water pumps ; pressure sensor ; [420] mA signal simulator; Pt100 and NiCrNi simulators.

studii

 

Activitati extracurriculare

Tools & Technologies used: Primary injection kit (ODEN AT)/Secondary injection kits (Omicron ,3 phase relay tester, CTER-91 , Programma Sverker) /Hand Held Communicator/Air,vacuum and water pumps/[420] mA signal simulator/Pt100 and NiCrNi simulators/Megger 5000Vdc/Phase rotation meter/Clamp meter (0-2000 A)/ABB SACE Pro010T Comunicator/ Miliohm meter/Phase rotation meter/Step-up transformer (5000 Vac)/Hioki Memory Hicorder/Current probe(1mA/1mV)/ Digital Thermometer/Load banks for battery chargers/Digital Ohmeter (Megger DLRO600).

Premii

Diploma in AutoCAD R14

aptitudini

 

Limbi straine(Scris,Vorbit,Citit):



Pagini: 1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20 

E timpul pentru un browser mai bun

De la 1 octombrie 2019, te informăm că site-ul eJobs.ro nu va mai putea fi accesat prin browser-ul Internet Explorer din cauza funcționalităților reduse ale acestuia. Accesează-ne cu încredere folosind unul dintre browserele mai moderne: Google Chrome, Mozilla Firefox, Safari sau Edge.

Am înțeles
close