| Expirat la: 25.08.2006 |
| Actualizat la: 23.08.2006 |
|
|
| Compania: |
SUMMA ROMANIA SA |
| Departament: |
Constructii, Instalatii, Amenajari, Controlul Calitatii, Inginerie, Productie |
| Orasul: |
Bucuresti
|
| Tip Job: |
Full time |
| Posturi disponibile: |
1 |
| Status: |
Inactiv |
|
| Nivel cariera: |
Mid-Level/Peste 3 Ani Exp,Manager/Executive Position |
| Limbi Straine: |
nespecificate |
| Oferta: |
nespecificat |
| Permis conducere: |
nespecificat |
| Data introducerii: |
25.07.2006 |
| Data limita: |
25.08.2006 |
|
|
RESPONSABILITATI / BENEFICII:
Accountabilities and Responsibilities:
to be responsible for contributing information and guidance to ensure the productive and
timely completion of the project through the preparation, coordination and continuous
up-dating of an overall program for the site construction work.
the study and assessment of target dates for the project and shall be completely familiar
with the work and the parameters of the work program. Ensuring that all programmed
activities have man hour contents in line with Company Procedures
the review of existing material and equipment schedules and obtain updated delivery
information from the relevant departments
assisting the Resident Site Manager and the Construction Superintendent in the preparation
of the construction plan
preparing the site plan consistent with the requirements and availability of the drawings,
specifications, target dates and definitive estimate
ensuring that all staff and subcontractors are made aware of the site plan and appreciate
the part they will need to play in its implementation
utilizing the progress data, update the site plan and inform those concerned when progress
is falling behind and maintain a constant check on materials and equipment delivery dates
through the use of a bi-weekly look-a-head schedule
progress meetings and report on the current situation and shall note all changes in the
forward plans and any restrictions on progress
recording works additional to the original requirements and all variations and
revisions which must be incorporated in the site plan and informing the appropriate staff and
subcontractors of any changes to their workload and any alterations to the targets previously set
collating work progress for each contract and each area and include them in the weekly
and monthly Site Reports
the review of, and agreement with, Subcontractors programs to ensure compatibility with
project requirements
the monitoring of site progress and preparation of weekly look ahead to maintain
objectives and agreed milestones
prepare man-hour criteria for all activities i.e. histogram. Mark-up drawings weekly to assess
progress to man-hours
To provide a full planning, work management and analysis of activities.
To ensure plans are tracked and reported. Highlighting and offering solutions to problems.
Be pro-active in all matters relating to Cost, Planning and Risk Analysis. .
Maintain all plans in readiness for monthly reporting
Ensure that all interfaces are identified, agreed and reviewed on a weekly basis
Ensure that all short term critical tasks are reviewed on a weekly basis
Assist in the development and maintaining of the department budget cost estimates
Safety Responsibilities:
To insure that the activities are performed in compliance with the provISIONS of the HSE Manual and related procedures and with the local safety regulations.
Qualifications & Experience:
The job holder must have
Engineering/Technical qualification
minimum of 3 years experience in planning of construction projects
experience in the same role on major projects would be a plus
Experience in preparing and executing control procedures for both cost and planning
Experience in Project start-up sequence and logic planning
fluent in both written and spoken English language
capable in using specific PC software and previous experience with Primavera, Microsoft Project
|