Pipeline ans Subsea Installation Engineer |
 |
| Compania: Grup Servicii Petroliere SA |
|
|
|
| Expirat la: 29.08.2009 |
| Actualizat la: 26.08.2009 |
|
|
| Compania: |
Grup Servicii Petroliere SA |
| Departament: |
Inginerie, Petrochimie, Petrol si Gaze |
| Orasul: |
Constanta
|
| Tip Job: |
Full time |
| Posturi disponibile: |
1 |
| Status: |
Inactiv |
|
| Nivel cariera: |
Mid-Level/Peste 3 Ani Exp |
| Limbi Straine: |
engleza, |
| Oferta: |
se va negocia in urma interviului |
| Permis conducere: |
nespecificat |
| Data introducerii: |
28.07.2009 |
| Data limita: |
28.08.2009 |
|
|
|
CANDIDATUL IDEAL:
-HTS or Unoversity in Mechanical Engineering or equivalent;
- Awareness and understanding of engineering design and calculations;
- Background in Offshore technology would be an advantage;
- Good interpersonal skilss and ability to be a team player;
- Ability to take responsibility for actions and justify decisions;
- MS Office Skills |
RESPONSABILITATI / BENEFICII:
- Attend the internal kick-off meeting;
- Read the project spec's and give comments with and engineering query.Interface with proposals engineer regarding bid qualifications/ workplan/ clarifications/ budgets;
- Prepare the engineering planning for the project(procedures/analysis) together with the Engineering Manager for presentation to the project team;
- Establish the manpower requirements to perform the onshore/ offshore scope of work together with the leading engineer or Engineering Manager (or delegate).The resource assignment is done by the Engineering Manager(or delegate) ;
- Produce the analysis/ procedures and raise the related Material Take Offs (MTO's) .If more resources are required, guide the engineers preparing the procedures and analysis;
- During the execution phase of the project, the installation engineer should assist offshore. The installation engineer is also responsible for the handover;
- Write the engineering input the Project Close Out report.Give also feedback to the lead engineer or Engineering Manager (or delegate). |
|